Panelized Build Experts Since 1969
Yankee Barn Homes has been in the panelized build construction business for over 50 years. We have perfected the speed of a home build, particularly focusing on the time your house and YBH Supervisor arrive on your site, to the time they leave. Our homes go up quickly, most often in under two weeks and are technically superior to other building methods in energy efficiency.
Read this: Why Yankee Barn Homes
Download this: Energy Efficient Features of a YBH Shell Package
Shortage into an Asset
There is an issue in today’s home build industry. There is a shortage of skilled builders with available calendar time. With Yankee Barn’s panelized system, the foreman and laborers arrive on site the same day as your house.
The skill set required to build a house is specific. We have combined a substantial portion of the skilled work in our factory before your home arrives on site. This means the Yankee Barn Supervisor can help your local general contractor raise and assemble the enclosed shell in as little as two weeks.
Construction Waste Lessened
Building your home components in our climate-controlled factory means it arrives on your build site in pre-constructed panels with a pre-cut frame, ready to go up in large sections.
The extensive measuring and cutting you find in a stick build does not exist with a Yankee Barn build. Your on-site waste is far less. Focus is placed on building your home, not on tossing wasted lumber into a garbage bin.
Fast Enclosure
Clients have been amazed at the short amount of time it takes for their Yankee Barn to go up and become enclosed.
Because the process is quick, we can build well into the cooler months and throughout the rainy seasons. Weather hazards become far less of an issue when the house is up and enclosed in two weeks.
Compare our enclosure timeline to that of a stick build company.
Advantage Yankee Barn Homes!